Bridges

Hill Street/CSX Rail line/Burnett Avenue Bridge

Updated Oct 28, 2025

Key Issues Identified

  • Beams have active corrosion
  • Abutment was repaired in 2019 after bridge was closed to severe deterioration, with a five year warranty
  • Piers have widespread spalling with exposed rebar
  • Bearings are over-expanded and have active corrosion

Inspection rating

Poor

Meaning at least one of its main components (deck, superstructure, or substructure) requires significant maintenance and repair to remain safe. Inspection is currently every 24 months but has been as often as every week in the past.

current ratings

  • Deck: 5
  • Superstructure: 5
  • Substructure: 4

Bridge Overview

Crosses Over:
  • Hill Street
  • CSX Rail line
  • Burnett Ave
Year Built: 1957
Bridge Type: Five-Span Steel Bridge

Planned Improvements

  • Full Replacement, resulting in a two-span steel multi-girder bridge

Why it Matters

  • Improved safety and mobility

Timeline

  • Under construction August 2025; completion expected March 2027