Bridges
Jacob Street / Broadway / Gray Street Bridge
Updated Jan 20, 2026
Key Issues Identified
- Deck separating from the beams
- Beams are expanding into the abutment backwalls, causing damage
- Abutments have wide cracks and large spalling, i.e. flaking and chipping
- Bearings are over-expanded and misaligned
Inspection rating
Poor
Meaning at least one of its main components (deck, superstructure, or substructure) requires significant maintenance and repair to remain safe. Inspection is current every 3 months.
current ratings
- Deck: 6
- Superstructure: 5
- Substructure: 4
Bridge Overview
Crosses Over:
- Jacob Street
- Broadway
- Gray Street
Year Built: 1960
Bridge Type: Bridge is a composite of concrete beams and is multiple spans
Planned Improvements
- Full replacement reduced to only 2 spans (1 over Broadway and 1 over Gray).
Why it Matters
- Improved safety and mobility
Timeline
- Under construction 2026; completion expected 2028