Bridges

Muhammad Ali Blvd On-Ramp Bridge

Updated Jan 20, 2026

Key Issues Identified

  • Deck separating from the beams
  • Beams are expanding into the abutment backwalls, causing damage
  • Abutments have wide cracks and large spalling
  • Bearings are over-expanded and misaligned

Inspection rating

Fair

A Fair rating indicates that while the bridge’s primary structural elements are sound, they may show signs of minor deterioration, section loss, cracking, or spalling, i.e. flaking and chipping.

current ratings

  • Deck: 6
  • Superstructure: 7
  • Substructure: 6

Bridge Overview

Crosses Over:

  • Muhammad Ali Blvd

Year Built: 1963
Bridge Type: Single-Span Steel Bridge

Planned Improvements

  • Deck replacement

Why it Matters

  • Improved safety and mobility

Timeline

  • Under Construction 2026; completion expected 2028

Interstate 65 is closing between the Watterson Expressway (I-264) and downtown Louisville (Jefferson Street) from June 1 through July 31.

Get ready for the temporary summer closure:

Sign up for text and email updates.

Download the Waze nav app.

Follow KYTC D5 on Facebook and X.